Castle Pill Wind Farm - 4 turbines

Pembrokeshire, Wale

Project : 4 wind turbines
Capacity : 3.2 megawatts; 3 turbines of 900 kilowatts, 1 of 500 kilowatts
Models EWT and Nordtank
Status : Operational
Duration : 18 months
Challenge : Accessing the turbines without disturbing current land use
Solution : Detailed design using existing farm tracks