Castle Pill Wind Farm - 4 turbines
Pembrokeshire, Wale
Project | : 4 wind turbines |
Capacity | : 3.2 megawatts; 3 turbines of 900 kilowatts, 1 of 500 kilowatts |
Models | : EWT and Nordtank |
Status | : Operational |
Duration | : 18 months |
Challenge | : Accessing the turbines without disturbing current land use |
Solution | : Detailed design using existing farm tracks |